Executive Performance Test Summary

I ran a load test with the following results:
[Paste JMeter summary or k6 output]

Write an executive summary (non-technical) covering:
- Test objective in one sentence
- Overall result: PASS / FAIL / CONDITIONAL PASS
- Key findings (3 bullet points max)
- Business impact of any failures found
- Recommendation: Go / No-Go for production
- Next steps

Keep it under 300 words. Avoid technical jargon. Use plain business language.

Technical Performance Test Report

Generate a detailed technical performance test report based on:

Test environment: [describe]
Test tool: [JMeter / k6]
Test date: [date]
Duration: [N minutes]
Peak VUs: [N]
Results: [paste summary table]
Errors observed: [describe]
Infrastructure metrics: [describe CPU, memory, DB during test]

Report should include:
- Test objectives and scope
- Test environment details
- Methodology and approach
- Results summary table
- Response time graphs description
- Throughput analysis
- Error analysis with root cause
- Infrastructure utilization summary
- Pass/fail against SLAs
- Root cause and recommendations
- Appendix: Raw data reference

Performance Regression Comparison

Compare these two performance test runs to identify regression:

Baseline (v1.0):
[Paste baseline results table]

Current (v2.0):
[Paste current results table]

Analyze:
- Which transactions regressed? (response time increase > 10%)
- Which transactions improved?
- Is the throughput change significant?
- Error rate comparison
- Overall regression verdict: Significant / Minor / None
- Suspected root causes for regressions
- Output as a comparison table with delta % and RAG status (Red/Amber/Green)